Everdura Power introduces the world's most proven Vanadium Redox Flow Battery technology with the largest installed base globally, driving localization across flagship national projects and commercial applications.

Global Representative Projects

Technology Centre Laufenburg

Technology Centre Laufenburg

World's Largest Green AI Data Center Storage Project: Selected by the FlexBase Group to build a landmark Vanadium Redox Flow Battery (VFB) system across a 20,000 m² technology park in Laufenburg, Switzerland[cite: 3].

  • Capacity & Power Output: Initial capacity of 1.5 GWh, expanding to 2.1 GWh[cite: 3]; delivers 800 MW to 1.2 GW of reliable power[cite: 3].
  • Timeline: Phased manufacturing and installation, scheduled for full completion by 2029[cite: 3].
Switzerland / Completion 2029
U.S. Department of Energy LODES Program

U.S. Department of Energy (DOE) LODES Program

U.S. DOE Long-Duration Energy Storage demonstration program utilizing intra-day (10 to 36 hours) and multi-day (36 to 160+ hours) storage solutions[cite: 3].

  • Project Scope: Invinity secured 6 out of 15 awarded LODES projects, totaling 84 MWh (Endurium)[cite: 3].
  • Key Benefit: Drastically reduces grid interruption frequency and duration caused by extreme weather or cyberattacks[cite: 3]. Announced in Sept 2023, with full delivery scheduled by end of 2026[cite: 3].
USA / Delivery End of 2026
Marine Corps Air Station Miramar

Marine Corps Air Station Miramar

Ensures round-the-clock energy resilience and power reliability while reducing total operational energy costs[cite: 3].

  • Application: VRFB integrated microgrid operational in both grid-connected and islanded modes[cite: 3].
  • Backup Duration: Provides up to 10 hours of long-duration energy security; completed in 2022[cite: 3].
California, USA / Completed 2022
Yadlamalka Solar & Storage Project

Yadlamalka Solar & Storage Project

One of the world's largest solar power plants paired with vanadium flow battery storage[cite: 3], representing Australia's largest commercial-scale VRFB installation[cite: 3].

  • System Specs: 8 MWh Invinity VRFB system DC-coupled with a 21 MWp solar farm[cite: 3].
  • Commercial Operation: Operational since 2024[cite: 3].
Yadlamalka, Australia / Operational 2024
European Marine Energy Centre (EMEC)

European Marine Energy Centre (EMEC)

Utilizes green electricity from tidal energy paired with flow batteries for hydrogen production via electrolysis, marking a major breakthrough in integrated renewable green hydrogen systems[cite: 3].

  • System Specs: 8 Invinity VS3 battery modules installed in Orkney, Scotland[cite: 3].
  • Completion: Completed in 2022[cite: 3].
Scotland, UK / Completed 2022
Oxford Smart City Grid Project

Oxford Smart City Grid Project

Jointly launched by Électricité de France (EDF), Oxford City Council, and the University of Oxford[cite: 3].

  • Application: Hybrid VRFB + Lithium-ion BESS; flow battery handles heavy cycling for PPA trading, Capacity Market (BM), and ancillary services[cite: 3].
  • Commercial Operation: Operational since Q2 2022[cite: 3].
Oxford, UK / Operational Q2 2022
Scottish Water

Scottish Water

Net-zero carbon water treatment operations combining 4 Invinity VS3 battery containers with on-site solar PV generation[cite: 3].

  • Key Benefits: Reduces grid energy costs by 40% and cuts 160 tonnes of CO2 emissions annually[cite: 3].
  • Commercial Operation: Operational since 2021[cite: 3].
Scotland, UK / Operational 2021
Viejas Casino & Resort

Viejas Casino & Resort

California Energy Commission (CEC) grant project designed to safeguard critical community infrastructure with clean energy[cite: 3].

  • Application: Solar-plus-storage VRFB microgrid providing 10 hours of backup power in wildfire-prone areas[cite: 3].
  • Commercial Operation: Operational since Q2 2023[cite: 3].
California, USA / Operational Q2 2023
Soboba Fire Station

Soboba Fire Station

California Energy Commission microgrid project pairing vanadium flow storage with solar PV[cite: 3].

  • Key Benefits: 10-hour energy storage capacity supplying uninterrupted critical emergency response power during seasonal wildfire shutoffs[cite: 3].
  • Commercial Operation: Operational since 2021[cite: 3].
California, USA / Operational 2021
Los Angeles Department of Water and Power (LADWP)

Los Angeles Department of Water and Power (LADWP)

Demonstrates VRFB performance for multi-use ancillary services and commercial grid support applications across the Los Angeles municipal power grid[cite: 3].

  • Grid Interconnection: Interconnected and operational since November 2019[cite: 3].
California, USA / Operational 2019
Fairfield Solar + Storage Project

Fairfield Solar + Storage Project

VRFB system integrated directly with NEXTracker solar array via DC coupling[cite: 3].

  • Key Benefits: Smooths intermittent solar generation and delivers reliable dispatchable green power to the grid[cite: 3].
  • Grid Interconnection: Interconnected and operational since December 2018[cite: 3].
Iowa, USA / Operational 2018
Pacific Northwest National Laboratory (PNNL)

Pacific Northwest National Laboratory (PNNL)

U.S. Department of Energy funded long-duration energy storage validation facility[cite: 3].

  • Scale & Scope: 12 MWh system designed to validate 4 to 24-hour energy discharge, peak demand reduction, and microgrid resiliency[cite: 3].
  • Timeline: Expected commercial operation in Q4 2026[cite: 3].
Washington, USA / Operational Q4 2026
Chappice Lake Solar + Storage Project

Chappice Lake Solar + Storage Project

Combines 8.4 MWh vanadium flow battery storage with a 21 MWp solar photovoltaic plant[cite: 3].

  • Key Benefits: Dispatches clean energy on demand to meet the daily electricity needs of over 7,000 local Albertans[cite: 3].
  • Commercial Operation: Operational since Q4 2023[cite: 3].
Alberta, Canada / Operational Q4 2023
Balatonberény Front-of-the-Meter Storage Project

Balatonberény Front-of-the-Meter Storage Project

3 MW / 10.8 MWh front-of-the-meter Endurium VRFB system co-located with a utility-scale solar farm (STS Group)[cite: 3].

  • Timeline: Scheduled for completion in Q2 2026[cite: 3].
Hungary / Completion Q2 2026
Gamesa Electric V-ion Project

Gamesa Electric V-ion Project

Joint development of next-generation grid-scale VRFB system in Zaragoza, testing and validating Endurium integration with wind and solar renewable assets[cite: 3].

  • Timeline: Expected commercial operation in Q4 2025[cite: 3].
Spain / Operational Q4 2025

Taiwan Local Deployments

Carrefour Nanzi Store

Carrefour Nanzi — Taiwan's 1st Commercial VRFB System

Installed 1 containerized Invinity VS3 vanadium flow battery storage system[cite: 3]. Provides peak shaving, emergency backup power, and demand response participation, pioneering behind-the-meter green retail storage in Taiwan[cite: 3].

Kaohsiung / Operational Q1 2021
ITRI Shalun Green Energy Technology Demonstration Site

ITRI Shalun Green Energy Demonstration Site

Partnered with Industrial Technology Research Institute (ITRI) for VRFB operational testing, charge/discharge behavior analysis, and Energy Management System (EMS) algorithm optimization[cite: 3].

Tainan / Operational Q1 2024
Guanyin Behind-the-Meter Hybrid BESS

Guanyin Behind-the-Meter Hybrid BESS

Taiwan's first commercial VRFB + Lithium-ion hybrid storage project[cite: 3]. Supported by Taoyuan City Government's 2023 Energy Storage Demonstration Grant for peak shaving, backup power, and power trading[cite: 3].

Taoyuan / Operational Q2 2023
National Center for Research on Earthquake Engineering

National Center for Research on Earthquake Engineering (NCREE)

30 Invinity VS3 battery modules installed indoors in the basement to back up critical national research equipment[cite: 3]. Fully demonstrates the non-flammable and non-explosive safety advantages of VRFB technology[cite: 3].

Tainan / Expected Operational Q3 2026